Purchase order response message
5. Segments Layout
 
Segment number:
83
-
C
200000
-
A group of segments providing details of the individual ordered items. This Segment group may be repeated to give sub-line details.
-
C
99
-
A group of segments specifying allowances and charges for the line item. Allowances and charges in the heading section of a message are independent from those in the detail section, e.g. ALC at detail level does not override ALC atheading level.
-
C
5
-
 
Function:
 
To specify date, and/or time, or period.
 
EDIFACT
EAN
*
Description
C507
DATE/TIME/PERIOD
M
M
   
Date or time or period function code qualifier
M
an..3
M
*
=
Start date/time
=
End date/time
2380
Date or time or period value
C
an..35
R
   
Date or time or period format code
C
an..3
R
 
=
CCYYMMDD
=
CCYYMMDDHHMM
=
CCYYMMDD-CCYYMMDD
Segment Notes:
This segment is used to specify any dates which are related to the allowances and/or charges detailed in the ALC segment.

Example:
DTM+194:20021201:102'
DTM+206:20021224:102'
This example indicates that the allowances and/or charges are valid from the 1st of December 2002 to the 24th of December 2002.
© Copyright GS1
Edition 2016